Hyperscaling AI

AI Challenge

It’s a given that datacenters need to be adaptable to current innovations and be able to accommodate workloads and demands that increase by the day. However, the landscape’s stability has been disrupted by a rapid surge in IT power density, challenging conventional assumptions and introducing an element of unpredictability.

 

Projections indicate that data centre demand will go up from 17GW in 2022 to 35GW by 2023 (McKinsey). This means colocation service providers need to be designing for future-proof solutions. For greenfield builds, immersion cooling ensures the reliability and longevity of the equipment. It offers a diverse array of options to optimize resource utilization, providing a strategic advantage in managing escalating workloads and ever-changing demands. From a brownfield perspective where factilities need to be retrofitted, immersion cooling becomes a transformative tool for leveraging existing infrastructure effectively. This approach not only facilitates the scaling of IT capacity but also effectively manages the surge in workloads, optimizing power utilization in the process.

Future Data Center Projects

Our vision is to invest into projects and properties that have the ability to support such a high demand need for power and space for AI. This includes projects across Fort Worth, Texas and surrounding cities as this demand increses.  If interested in our current Hyperscale / IXP project in Fort Worth, Texas please contact us today before space is filled. 

Project Info

Category

Hyperscale Data Center

Client

Cloudnium LLC.

Industry

Colocation/Technology

Funding

$300M to $500M

Conclusion

The Solution

We are looking to pre-sign 5 anchor clients for AI / Cloud / Mining and secure $500M to purchase and build out the facility that will change the face of Fort Worth, Texas. This project not only helps secure Fort Worth as one of the highest source of space/power/bandwidth in the region but it will draw other companies in the area to form a massive hosting environment not seen anywhere else. 

$5B Project after year 7 - 10
$5B Project after year 7 - 10
Only IXP Exchange in Fort Worth, TX.
Only IXP Exchange in Fort Worth, TX.
15Tbps to 20Tbps of Bandwidth and Providers
15Tbps to 20Tbps of Bandwidth and Providers
Local Need
Local Need
This project would increase the number of high paying jobs and industry demand. This would also allow local Universities and High Schools the opprotunity to have access to the next generation of technology at their finger tips.
Funding
Funding
We are looking to raise $300M to $500M to complete the project. This will include the purchase of the project and completion of the suites and 5 anchor spaces.